Advanced Search (**case sensitive**)

The Document Archive currently contains 167,452 Records

Tips on how to use advanced search

  • Search terms are case sensitive. Trump ≠ trump
  • From Date and To Date:  To define a date range, provide both fields. To search all documents before or after a specific date, provide only one date. The search will not accept only a year date.
  • Phrase Search:  Use double quotation marks ("). Example: "live in infamy"
  • Wildcards are supported, except for leading wildcards. Example: tes* (would match test, testing, and tester); *est does not work.
  • Search operators such as AND OR NOT && || ! are not supported.
  • Search term input values cannot exceed 256 characters.

MORE TIPS

Results   1 - 10 of 10 records found

Date Related Document Title
Mar 29, 2019 Donald J. Trump (1st Term) Presidential Permit—Authorizing TransCanada Keystone Pipeline, L.P., To Construct, Connect, Operate, and Maintain Pipeline Facilities at the International Boundary Between the United States and Canada
Jul 29, 2020 Donald J. Trump (1st Term) Presidential Permit—Authorizing NuStar Logistics, L.P., To Operate and Maintain Existing Pipeline Facilities at the International Boundary Between the United States and Mexico
Jul 29, 2020 Donald J. Trump (1st Term) Presidential Permit—Authorizing NuStar Logistics, L.P., To Construct, Connect, Operate, and Maintain Pipeline Facilities at the International Boundary Between the United States and Mexico
Jul 29, 2020 Donald J. Trump (1st Term) Presidential Permit—Authorizing TransCanada Keystone Pipeline, L.P., To Operate and Maintain Existing Pipeline Facilities at the International Boundary Between the United States and Canada
Jul 29, 2020 Donald J. Trump (1st Term) Presidential Permit—Authorizing the Kansas City Southern Railway Company To Construct, Connect, Operate, and Maintain Railway Bridge Facilities at the International Boundary Between the United States and Mexico
Sep 28, 2020 Donald J. Trump (1st Term) Presidential Permit—Authorizing the Alaska to Alberta Railway Development Corporation To Construct, Connect, Operate, and Maintain Railway Facilities at the International Boundary Between the United States and Canada
Oct 03, 2020 Donald J. Trump (1st Term) Presidential Permit—Authorizing Express Pipeline, LLC, To Operate and Maintain Existing Pipeline Facilities at the International Boundary Between the United States and Canada
Oct 03, 2020 Donald J. Trump (1st Term) Presidential Permit—Authorizing Front Range Pipeline, LLC, To Operate and Maintain Existing Pipeline Facilities at the International Boundary Between the United States and Canada
Oct 03, 2020 Donald J. Trump (1st Term) Presidential Permit—Authorizing NuStar Logistics, L.P., To Operate and Maintain Existing Pipeline Facilities at the International Boundary Between the United States and Mexico
Dec 31, 2020 Donald J. Trump (1st Term) Presidential Permit—Authorizing the City of Pharr, Texas, To Construct, Connect, Operate, and Maintain Bridge Facilities at the International Boundary Between the United States and Mexico